Transcity Joint Venture: Legacy Way

PROJECT TCJV

proj-tcjv

WW Surveys supplied the survey management and part of the survey services to successfully support the design and construction of this landmark project.

Our support for Legacy Way included the construction of two 4.3-km tunnels, each with two lanes, along with the excavation and fit-out of 34 cross passages, 10 substations, one low point sump, multiple bridges, connection motorway realignments and numerous auxiliary structures/buildings.

Throughout the peak of operations, WW Surveys supervised the survey resources of 22 survey personnel through all aspects of the construction process.

Successfully working closely with all members of the project team from before the turning of the first sod through to completion of the WAE survey, WW Surveys has proven it can play a critical role in delivering a significant project of this calibre.

Client: Brisbane City Council

Project value: $1.5 billion

Project duration: April 2011 to May 2015

Principal contractors: Acciona Infrastructure, BMD and Ghella